4. Production Planning
The Production board (sidebar: Production) is where you schedule what the roastery will make. It requires the view productions permission.
Board layout
Production runs are organised in columns — typically one column per machine (roaster, grinder, pack line). Each run is a card you can drag to reorder.
Roaster 1 Roaster 2 Roaster 3
┌─────────────┐ ┌──────────────┐ ┌─────────────┐
│ House Blend │ │ In progress│ │ │
│ 8 batches │ │ SO Ethiopia │ │ (idle) │
│ Mon 08:00 │ │ 4 batches │ │ │
└─────────────┘ └──────────────┘ └─────────────┘
┌─────────────┐ ┌──────────────┐
│ Decaf Blend │ │ │
│ 6 batches │ │ │
└─────────────┘ └──────────────┘
Scheduling a production run
Key fields when scheduling:
| Field | Description |
|---|---|
| Recipe | What you're making |
| Realisation on | Which machine runs the job |
| Target cell | Where finished coffee is stored |
| Batch quantity | How many batches to produce |
| Batch size | Kg per batch |
| Customer | Optional link to a sales order |
| Note | Free text for the team |
See Productions for the underlying concept.
Inventory check
Before a busy day, run an inventory check to confirm enough upstream coffee (e.g. green) exists for the planned runs. It shows per-recipe requirements versus what's available in cells.
Recipe Required Available Status
------------------------------------------------
House Blend 480 kg 520 kg OK
Ethiopia SO 120 kg 95 kg Shortage
A shortage flag means you should adjust the plan or top up stock before running.
Optimise the schedule
Roasthubs can suggest a better run order to improve:
- Stability — smoother transitions between recipes
- Gas / energy usage — reduced consumption
Review the suggested order, then apply it to update the board.
Reordering and editing runs
- Drag a card to change its position in a machine's queue.
- Open a card to edit its details or remove it from the plan.
- Move a card between machine columns to change where it runs.
Following a run
Open a run to see its batches and the lots they produce. As batches complete, lots appear with their weights and timings. The run reflects the production lifecycle: Planned → In progress → Completed.
Sidebar indicator
The Production sidebar item shows an indicator when runs are queued or in progress, so planners can see outstanding work at a glance.
Continue to Working with Zones →.