Skip to main content

4. Production Planning

The Production board (sidebar: Production) is where you schedule what the roastery will make. It requires the view productions permission.

Board layout

Production runs are organised in columns — typically one column per machine (roaster, grinder, pack line). Each run is a card you can drag to reorder.

Roaster 1 Roaster 2 Roaster 3
┌─────────────┐ ┌──────────────┐ ┌─────────────┐
│ House Blend │ │ In progress│ │ │
│ 8 batches │ │ SO Ethiopia │ │ (idle) │
│ Mon 08:00 │ │ 4 batches │ │ │
└─────────────┘ └──────────────┘ └─────────────┘
┌─────────────┐ ┌──────────────┐
│ Decaf Blend │ │ │
│ 6 batches │ │ │
└─────────────┘ └──────────────┘

Scheduling a production run

Key fields when scheduling:

FieldDescription
RecipeWhat you're making
Realisation onWhich machine runs the job
Target cellWhere finished coffee is stored
Batch quantityHow many batches to produce
Batch sizeKg per batch
CustomerOptional link to a sales order
NoteFree text for the team

See Productions for the underlying concept.

Inventory check

Before a busy day, run an inventory check to confirm enough upstream coffee (e.g. green) exists for the planned runs. It shows per-recipe requirements versus what's available in cells.

Recipe Required Available Status
------------------------------------------------
House Blend 480 kg 520 kg OK
Ethiopia SO 120 kg 95 kg Shortage

A shortage flag means you should adjust the plan or top up stock before running.

Optimise the schedule

Roasthubs can suggest a better run order to improve:

  • Stability — smoother transitions between recipes
  • Gas / energy usage — reduced consumption

Review the suggested order, then apply it to update the board.

Reordering and editing runs

  • Drag a card to change its position in a machine's queue.
  • Open a card to edit its details or remove it from the plan.
  • Move a card between machine columns to change where it runs.

Following a run

Open a run to see its batches and the lots they produce. As batches complete, lots appear with their weights and timings. The run reflects the production lifecycle: Planned → In progress → Completed.

The Production sidebar item shows an indicator when runs are queued or in progress, so planners can see outstanding work at a glance.

Continue to Working with Zones →.